CONCEPT CREATORS
U
Can I Customise SUPASLAT?

Can I Customise SUPASLAT?

Customisation doesn’t have to mean compromising on compliance. Discover how SUPAWOOD’s unique Surface Area Calculator allows for bespoke timber slat designs while maintaining certified Fire Group 1, 2, or 3 ratings under NCC 2022/2025.

What is Wrong with Using Fire Intumescent Paint to Achieve Fire Group Numbers?

What is Wrong with Using Fire Intumescent Paint to Achieve Fire Group Numbers?

Using fire intumescent coatings to achieve Group 1 or 2 ratings on timber panels often creates a dangerous gap between certification and reality. From the difficulty of achieving a 230-micron film on porous MDF edges to strict annual inspection requirements, discover why SUPAWOOD advocates for factory-certified systems over on-site coatings to ensure genuine project safety.

How can I reach Fire Group Rating 1 for my school project?

How can I reach Fire Group Rating 1 for my school project?

Achieving Fire Group Rating 1 in education projects is a critical balancing act between safety and acoustics. This guide breaks down the NCC 2022/2025 requirements for fire-isolated exits, public corridors, and classrooms. Discover how SUPAWOOD’s factory-certified FR MDF panels deliver world-class acoustic performance while meeting the highest fire safety standards in Australia.

What is considered a non-combustible wall?

What is considered a non-combustible wall?

Understanding the definition of a non-combustible wall is critical for project certification. This guide breaks down the NCC requirements for construction materials, explains the difference between integral wall elements and ancillary attachments, and explores the compliance pathways for fixing timber linings to non-combustible structures.

What Fire Group Number Do I Need?

What Fire Group Number Do I Need?

Navigating Fire Group ratings can be complex. This guide breaks down the NCC requirements for internal linings, explains the difference between AS 3837 and ISO 9705 testing, and provides a “cheat sheet” to help you identify the correct fire group for your project—updated with March 2026 compliance context.